Renewable Energy
Capacity
In operation
1,203,304 kW
Under construction
104,665 kW
Annual amount of electricity sold(FY2023)
1,464,868,458 kWh
Equivalent to the annual power consumption of 350,000 households
(Calculated assuming that the average annual electricity consumption is 4,175kWh)
Annual amount of CO2 reduction effect(FY2023)
641,612 t-CO2
Approx. 45.83 million cedar trees
(Calculated assuming that one cedar tree absorbs an average of 14kg of CO2 annually)
The number of Power Plant | Capacity | |
---|---|---|
Solar power generation | 89 | 950,014kW |
Wind power generation | 12 | 228,890kW |
Biomass power generation | 1 | 24,400kW |
Total | 102 | 1,203,304kW |
Area | Name of power plant | Capacity | Commercial Operation Date |
---|---|---|---|
Hokkaido | Hokkaido Oyafuru Solar Power Plant ASolar power generation | 3,013.5kW | July 19th , 2024 |
Hokkaido | Hokkaido Oyafuru Solar Power Plant BSolar power generation | 3,013.5kW | May 31st , 2024 |
Hokkaido | Muroran Second Mega Solar Power Plant Solar power generation | 836kW | August 20th , 2024 |
Tohoku | Aomori Solar Power PlantSolar power generation | 7,210kW | September 1st, 2019 |
Tohoku | JRE Shichinohe Solar Power PlantSolar power generation | 3,089kW | September 1st, 2017 |
Tohoku | JRE Shichinohe Towada Wind FarmWind power generation | 33,600kW | December 28th, 2021 |
Tohoku | JRE Takamori Solar Power PlantSolar power generation | 1,008kW | August 6th, 2014 |
Tohoku | Rokunohe Solar ParkSolar power generation | 22,090kW | August 1st, 2017 |
Tohoku | JRE Oritsumedake South 1 Wind FarmWind power generation | 46,800kW | January 14th, 2023 |
Tohoku | JRE Iwadeyama Solar Power PlantSolar power generation | 1,771kW | February 28th, 2014 |
Tohoku | JRE Osato Solar Power PlantSolar power generation | 1,274kW | February 28th, 2014 |
Tohoku | Sendai Mega Solar Power PlantSolar power generation | 1,030kW | February 25th, 2013 |
Tohoku | JRE Miyagi Kami Wind FarmWind power generation | 42,000kW | May 2nd, 2024 |
Tohoku | Akita Mega Solar Power PlantSolar power generation | 6,270kW | October 28th, 2014 |
Tohoku | Oga Mega Solar Power PlantSolar power generation | 2,400kW | March 24th, 2016 |
Tohoku | Tsuchihama First Wind Power PlantWind power generation | 1,500kW | March 20th, 2003 |
Tohoku | JRE Noshiromitane Solar Power PlantSolar power generation | 16,879kW | December 26th, 2017 |
Tohoku | Sakata Port Mega Solar ParkSolar power generation | 28,531kW | December 1st, 2016 |
Tohoku | Sakata Mega Solar Power PlantSolar power generation | 750kW | September 1st, 2020 |
Tohoku | JRE Tsuruoka Hachimoriyama Wind FarmWind power generation | 17,000kW | November 12th, 2021 |
Tohoku | Azumakogen Wind FarmWind power generation | 32,400kW | May 1st, 2023 |
Tohoku | Iwaki Solar Power PlantSolar power generation | 26,680kW | April 1st, 2018 |
Tohoku | Iwaki Mega Solar Power PlantSolar power generation | 990kW | July 17th, 2014 |
Tohoku | Shirakawa Solar ParkSolar power generation | 73,892kW | November 20th, 2021 |
Tohoku | Nishinosato Solar ParkSolar power generation | 44,001kW | January 2nd, 2020 |
Kanto | JRE Inashiki Isatsu Solar Power PlantSolar power generation | 6,052kW | April 1st, 2019 |
Kanto | JRE Inashiki Kamagayama Solar Power PlantSolar power generation | 665kW | January 31st, 2022 |
Kanto | JRE Inashiki Sakura Solar Power PlantSolar power generation | 17,104kW | January 2nd, 2019 |
Kanto | Kasumigaura Mega Solar Power PlantSolar power generation | 2,550kW | November 15th, 2013 |
Kanto | JRE Kamisu Biomass Power PlantBiomass power generation | 24,400kW | May 1st, 2019 |
Kanto | JRE Tsuchiura Solar Power PlantSolar power generation | 23,078kW | September 1st, 2018 |
Kanto | JRE Namegata Solar Power PlantSolar power generation | 945kW | January 24th, 2014 |
Kanto | JRE Hasaki North Solar Power PlantSolar power generation | 3,163kW | September 1st, 2019 |
Kanto | JRE Hasaki Solar Power PlantSolar power generation | 2,640kW | July 1st, 2014 |
Kanto | Hitachi Mega Solar Power PlantSolar power generation | 2,040kW | March 25th, 2016 |
Kanto | Mito New Town Mega Solar ParkSolar power generation | 44,444kW | January 5th, 2015 |
Kanto | JRE Miho 1 Solar Power PlantSolar power generation | 2,964kW | December 16th, 2015 |
Kanto | JRE Miho 2 Solar Power PlantSolar power generation | 2,399kW | December 16th, 2015 |
Kanto | JRE Miho 3 Solar Power PlantSolar power generation | 1,000kW | December 16th, 2015 |
Kanto | JRE Miho 4 Solar Power PlantSolar power generation | 3,382kW | October 31st, 2018 |
Kanto | JRE Mashiko Solar Power PlantSolar power generation | 8,064kW | March 25th, 2016 |
Kanto | Asaka Mega Solar Power PlantSolar power generation | 1,030kW | March 30th, 2016 |
Kanto | Okabe Mega Solar Power PlantSolar power generation | 1,390kW | March 20th, 2019 |
Kanto | JRE Katori West Solar Power PlantSolar power generation | 2,461kW | May 1st, 2015 |
Kanto | JRE Katori East Solar Power PlantSolar power generation | 2,068kW | May 1st, 2015 |
Kanto | Ogishima Wind Power PlantWind power generation | 1,990kW | March 25th, 2010 |
Chubu | Niigata Umibeno-mori Solar ParkSolar power generation | 14,224kW | August 19th, 2016 |
Chubu | Niigata Second Mega Solar Power PlantSolar power generation | 907kW | March 1st, 2024 |
Chubu | Niigata Third Mega Solar Power PlantSolar power generation | 3,340kW | March 29th, 2024 |
Chubu | Toyama Mega Solar Power PlantSolar power generation | 2,860kW | January 1st, 2017 |
Chubu | Toyama Second Mega Solar Power PlantSolar power generation | 690kW | February 14th, 2022 |
Chubu | Fushiki Mega Solar Power PlantSolar power generation | 710kW | March 18th, 2021 |
Chubu | Sakai Mega Solar Power PlantSolar power generation | 2,860kW | January 1st, 2017 |
Chubu | JRE Shika Saikai Wind FarmWind power generation | 9,600kW | January 18th, 2020 |
Chubu | JRE Nagano Omachi Solar Power PlantSolar power generation | 2,443kW | April 1st, 2022 |
Chubu | Gamagori Mega Solar Power PlantSolar power generation | 650kW | March 28th, 2017 |
Kinki | JRE Konsa Solar Power PlantSolar power generation | 8,971kW | August 24th, 2017 |
Kinki | JRE Kamikomazuki Solar Power PlantSolar power generation | 3,015kW | November 19th, 2018 |
Kinki | JRE Takashima Solar Power PlantSolar power generation | 13,180kW | May 1st, 2020 |
Kinki | Banshu Mega Solar Power PlantSolar power generation | 76,810kW | January 6th, 2023 |
Kinki | Sanda Mega Solar Power PlantSolar power generation | 121,088kW | August 16th, 2023 |
Kinki | JRE Himeji Solar Power PlantSolar power generation | 12,600kW | March 31st, 2016 |
Kinki | JRE Negoro Solar Power PlantSolar power generation | 2,485kW | March 10th, 2015 |
Kinki | JRE Negoro North Solar Power PlantSolar power generation | 1,285kW | March 10th, 2015 |
Kinki | JRE Hidakagawa Solar Power PlantSolar power generation | 16,800kW | March 1st, 2016 |
Kinki | Wakayama Mega Solar Power PlantSolar power generation | 8,500kW | June 1st, 2023 |
Chugoku | Sakaiminato Mega Solar Power PlantSolar power generation | 841kW | March 27th, 2024 |
Chugoku | Hamada First Solar Power PlantSolar power generation | 10,980kW | November 1st, 2015 |
Chugoku | Hamada Second Solar Power PlantSolar power generation | 11,870kW | March 1st, 2017 |
Chugoku | Hiroshima Mega Solar Power PlantSolar power generation | 1,250kW | March 14th, 2016 |
Chugoku | Ube Middle Solar Power PlantSolar power generation | 492kW | February 28th, 2024 |
Chugoku | Kudamatsu Mega Solar Power PlantSolar power generation | 1,800kW | March 23rd, 2013 |
Chugoku | Kudamatsu Second Mega Solar Power PlantSolar power generation | 2,850kW | September 25th, 2014 |
Chugoku | Shimonoseki Mega Solar Power PlantSolar power generation | 1,090kW | November 11th, 2020 |
Shikoku | JRE Kochi Kami Solar Power PlantSolar power generation | 9,772kW | October 1st, 2017 |
Shikoku | Takamatsu Mega Solar Power PlantSolar power generation | 1,390kW | February 18th, 2015 |
Shikoku | Takamatsu Second Mega Solar Power PlantSolar power generation | 1,490kW | March 22nd, 2022 |
Shikoku | Masaki Mega Solar Power PlantSolar power generation | 2,130kW | February 16th, 2015 |
Kyushu | Hibikinada Wind Energy Research Park
Solar power
generation
Wind power generation |
3,042kW | September 1st, 2017 |
6,600kW | January 1st, 2018 | ||
Kyushu | JRE Fukuoka Akamura Solar Power PlantSolar power generation | 2,428kW | November 2nd, 2015 |
Kyushu | Fukuoka Mega Solar Power PlantSolar power generation | 994kW | February 29th, 2024 |
Kyushu | JRE Fukuchi 1 Solar Power PlantSolar power generation | 2,334kW | April 17th, 2017 |
Kyushu | JRE Fukuchi 2 Solar Power PlantSolar power generation | 2,334kW | April 17th, 2017 |
Kyushu | JRE Fukuchi 3 Solar Power PlantSolar power generation | 2,334kW | April 17th, 2017 |
Kyushu | JRE Fukuchi 4 Solar Power PlantSolar power generation | 843kW | April 17th, 2017 |
Kyushu | JRE Hirado Ikitsuki Wind FarmWind power generation | 8,600kW | April 10th, 2024 |
Kyushu | JRE Aso Takamori Solar Power PlantSolar power generation | 62,525kW | May 19th, 2022 |
Kyushu | Yatsushiro Mega Solar Power PlantSolar power generation | 900kW | December 5th, 2021 |
Kyushu | Yatsushiro Second Mega Solar Power PlantSolar power generation | 916kW | March 22nd, 2024 |
Kyushu | JRE Yamato Takamori Solar Power PlantSolar power generation | 79,955kW | September 7th, 2022 |
Kyushu | Oita Mega Solar Power PlantSolar power generation | 910kW | March 24th, 2015 |
Kyushu | Nakakyushu Onitayama Wind FarmWind power generation | 16,000kW | September 3rd, 2016 |
Kyushu | Nakakyushu Onitayama 2 Wind FarmWind power generation | 12,800kW | September 4th, 2023 |
Kyushu | Ikezono Power PlantSolar power generation | 2,785kW | December 22nd, 2014 |
Kyushu | Kawahigashi Power PlantSolar power generation | 2,503kW | November 5th, 2014 |
Kyushu | JRE Satsuma Solar Power PlantSolar power generation | 54,227kW | January 11th, 2023 |
Kyushu | Naganoda Power PlantSolar power generation | 1,403kW | March 14th, 2014 |
Kyushu | Nishimata Power PlantSolar power generation | 1,145kW | March 5th, 2014 |
Kyushu | JRE Makurazaki Solar Power PlantSolar power generation | 2,946kW | February 1st, 2018 |
Kyushu | Uruma Mega Solar Power PlantSolar power generation | 12,200kW | March 23rd, 2015 |
Overseas | Taiwan, Big Canal Solar PlantSolar power generation | 1,750kW | September 1st, 2020 |
Capacity
3,013.5kW
Scheduled Commercial
Operation Date
July 19th, 2024
Capacity
3,013.5kW
Scheduled Commercial
Operation Date
May 31st, 2024
Capacity
836kW
Scheduled Commercial
Operation Date
August 20th, 2024
Capacity
7,210kW
Commercial Operation Date
September 1st, 2019
Capacity
3,089kW
Commercial Operation Date
September 1st, 2017
Capacity
33,600kW
Commercial Operation Date
December 28th, 2021
Capacity
1,008kW
Commercial Operation Date
August 6th, 2014
Capacity
22,090kW
Commercial Operation Date
August 1st, 2017
Capacity
46,800kW
Commercial Operation Date
January 14th, 2023
Capacity
1,771kW
Commercial Operation Date
February 28th, 2014
Capacity
1,274kW
Commercial Operation Date
February 28th, 2014
Capacity
1,030kW
Commercial Operation Date
February 25th, 2013
Capacity
42,000kW
Commercial Operation Date
May 2nd, 2024
Capacity
6,270kW
Commercial Operation Date
October 28th, 2014
Capacity
2,400kW
Commercial Operation Date
March 24th, 2016
Capacity
1,500kW
Commercial Operation Date
March 20th, 2003
Capacity
16,879kW
Commercial Operation Date
December 26th, 2017
Capacity
28,531kW
Commercial Operation Date
December 1st, 2016
Capacity
750kW
Commercial Operation Date
September 1st, 2020
Capacity
17,000kW
Commercial Operation Date
November 12th, 2021
Capacity
32,400kW
Commercial Operation Date
May 1st, 2023
Capacity
26,680kW
Commercial Operation Date
April 1st, 2018
Capacity
990kW
Commercial Operation Date
July 17th, 2014
Capacity
73,892kW
Commercial Operation Date
November 20th, 2021
Capacity
44,001kW
Commercial Operation Date
January 2nd, 2020
Capacity
6,052kW
Commercial Operation Date
April 1st, 2019
Capacity
665kW
Commercial Operation Date
January 31st, 2022
Capacity
17,104kW
Commercial Operation Date
January 2nd, 2019
Capacity
2,550kW
Commercial Operation Date
November 15th, 2013
Capacity
24,400kW
Commercial Operation Date
May 1st, 2019
Capacity
23,078kW
Commercial Operation Date
September 1st, 2018
Capacity
945kW
Commercial Operation Date
January 24th, 2014
Capacity
3,163kW
Commercial Operation Date
September 1st, 2019
Capacity
2,640kW
Commercial Operation Date
July 1st, 2014
Capacity
2,040kW
Commercial Operation Date
March 25th, 2016
Capacity
44,444kW
Commercial Operation Date
January 5th, 2015
Capacity
2,964kW
Commercial Operation Date
December 16th, 2015
Capacity
2,399kW
Commercial Operation Date
December 16th, 2015
Capacity
1,000kW
Commercial Operation Date
December 16th, 2015
Capacity
3,382kW
Commercial Operation Date
October 31st, 2018
Capacity
8,064kW
Commercial Operation Date
March 25th, 2016
Capacity
1,030kW
Commercial Operation Date
March 30th, 2016
Capacity
1,390kW
Commercial Operation Date
March 20th, 2019
Capacity
2,461kW
Commercial Operation Date
May 1st, 2015
Capacity
2,068kW
Commercial Operation Date
May 1st, 2015
Capacity
1,990kW
Commercial Operation Date
March 25th, 2010
Capacity
14,224kW
Commercial Operation Date
August 19th, 2016
Capacity
907kW
Commercial Operation Date
March 1st, 2024
Capacity
3,340kW
Commercial Operation Date
March 29th, 2024
Capacity
2,860kW
Commercial Operation Date
January 1st, 2017
Capacity
690kW
Commercial Operation Date
February 14th, 2022
Capacity
710kW
Commercial Operation Date
March 18th, 2021
Capacity
2,860kW
Commercial Operation Date
January 1st, 2017
Capacity
9,600kW
Commercial Operation Date
January 18th, 2020
Capacity
2,443kW
Commercial Operation Date
April 1st, 2022
Capacity
650kW
Commercial Operation Date
March 28th, 2017
Capacity
8,971kW
Commercial Operation Date
August 24th, 2017
Capacity
3,015kW
Commercial Operation Date
November 19th, 2018
Capacity
13,180kW
Commercial Operation Date
May 1st, 2020
Capacity
76,810kW
Commercial Operation Date
January 6th, 2023
Capacity
121,088kW
Commercial Operation Date
August 16th, 2023
Capacity
12,600kW
Commercial Operation Date
March 31st, 2016
Capacity
2,485kW
Commercial Operation Date
March 10th, 2015
Capacity
1,285kW
Commercial Operation Date
March 10th, 2015
Capacity
16,800kW
Commercial Operation Date
March 1st, 2016
Capacity
8,500kW
Commercial Operation Date
June 1st, 2023
Capacity
841kW
Commercial Operation Date
March 27th, 2024
Capacity
10,980kW
Commercial Operation Date
November 1st, 2015
Capacity
11,870kW
Commercial Operation Date
March 1st, 2017
Capacity
1,250kW
Commercial Operation Date
March 14th, 2016
Capacity
492kW
Commercial Operation Date
February 28th, 2024
Capacity
1,800kW
Commercial Operation Date
March 23rd, 2013
Capacity
2,850kW
Commercial Operation Date
September 25th, 2014
Capacity
1,090kW
Commercial Operation Date
November 11th, 2020
Capacity
9,772kW
Commercial Operation Date
October 1st, 2017
Capacity
1,390kW
Commercial Operation Date
February 18th, 2015
Capacity
1,490kW
Commercial Operation Date
March 22nd, 2022
Capacity
2,130kW
Commercial Operation Date
February 16th, 2015
Capacity
3,042kW
Commercial Operation Date
September 1st, 2017
Capacity
6,600kW
Commercial Operation Date
January 1st, 2018
Capacity
2,428kW
Commercial Operation Date
November 2nd, 2015
Capacity
994kW
Commercial Operation Date
February 29th, 2024
Capacity
2,334kW
Commercial Operation Date
April 17th, 2017
Capacity
2,334kW
Commercial Operation Date
April 17th, 2017
Capacity
2,334kW
Commercial Operation Date
April 17th, 2017
Capacity
843kW
Commercial Operation Date
April 17th, 2017
Capacity
8,600kW
Commercial Operation Date
April 10th, 2024
Capacity
62,525kW
Commercial Operation Date
May 19th, 2022
Capacity
900kW
Commercial Operation Date
December 5th, 2021
Capacity
916kW
Commercial Operation Date
March 22nd, 2024
Capacity
79,955kW
Commercial Operation Date
September 7th, 2022
Capacity
910kW
Commercial Operation Date
March 24th, 2015
Capacity
16,000kW
Commercial Operation Date
September 3rd, 2016
Capacity
12,800kW
Commercial Operation Date
September 4th, 2023
Capacity
2,785kW
Commercial Operation Date
December 22nd, 2014
Capacity
2,503kW
Commercial Operation Date
November 5th, 2014
Capacity
54,227kW
Commercial Operation Date
January 11th, 2023
Capacity
1,403kW
Commercial Operation Date
March 14th, 2014
Capacity
1,145kW
Commercial Operation Date
March 5th, 2014
Capacity
2,946kW
Commercial Operation Date
February 1st, 2018
Capacity
12,200kW
Commercial Operation Date
March 23th, 2015
Capacity
1,750kW
Commercial Operation Date
September 1st, 2020
The number of Power Plant | Capacity | |
---|---|---|
Solar power generation | 11 | 75,894kW |
Wind power generation | 2 | 29,600kW |
Total | 13 | 105,494kW |
Area | Name of power plant | Capacity | Scheduled Commercial Operation Date |
---|---|---|---|
Hokkaido | Biratori Nukibetsu Chuou Solar Power Plant Solar power generation | 4,050kW | July 2025 |
Hokkaido | Hokkaido Oyafuru Solar Power Plant CSolar power generation | 3,087kW | November 2024 |
Hokkaido | Muroran Second Mega Solar Power Plant Solar power generation | 836kW | August 2024 |
Tohoku | Iwate Takizawa Solar Power PlantSolar power generation | 2,631kW | March 2025 |
Tohoku | JRE Kamaishi Katagishi Solar Power PlantSolar power generation | 1,539kW | March 2025 |
Tohoku | JRE Kamaishi Kasshi Solar Power PlantSolar power generation | 1,421kW | February 2025 |
Tohoku | JRE Sakata Wind Farm(replace)Wind power generation | 21,000kW | January 2027 |
Chubu | Niigata First Mega Solar Power PlantSolar power generation | 18,000kW | December 2024 |
Kinki | Osaka Mega Solar Power PlantSolar power generation | 22,919kW | December 2024 |
Kinki | Kansai area low voltage bulk Solar Power Plant①Solar power generation | 3,000kW | December 2024 |
Chugoku | Kudamatsu Fourth Mega Solar Power PlantSolar power generation | 17,010kW | November 2025 |
Kyushu | JRE Oita Beppuwan Wind FarmWind power generation | 8,600kW | February 2025 |
Kyushu | JRE Fukuchi Kaneda Solar Power PlantSolar power generation | 1,346kW | March 2025 |
Capacity
4,050kW
Scheduled Commercial
Operation Date
July 2025
Capacity
3,087kW
Scheduled Commercial
Operation Date
November 2024
Capacity
2,631kW
Scheduled Commercial
Operation Date
March 2025
Capacity
1,539kW
Scheduled Commercial
Operation Date
March 2025
Capacity
1,421kW
Scheduled Commercial
Operation Date
February 2025
Capacity
21,000kW
Scheduled Commercial
Operation Date
January 2027
Capacity
18,000kW
Scheduled Commercial
Operation Date
December 2024
Capacity
22,919kW
Scheduled Commercial
Operation Date
December 2024
Capacity
3,000kW
Scheduled Commercial
Operation Date
December 2024
Capacity
17,010kW
Scheduled Commercial
Operation Date
November 2025
Capacity
8,600kW
Scheduled Commercial
Operation Date
February 2025
Capacity
1,346kW
Scheduled Commercial
Operation Date
March 2025
Location | Noshiro city / Mitane town, Akita |
---|---|
Capacity | 16,879kW |
Annual power generation | Approx.17,100,000kWh |
Commercial Operation Date | December 26th, 2017 |
Location | Rokunohe town, Aomori |
---|---|
Capacity | 22,090kW |
Annual power generation | Approx.26,000,000kWh |
Commercial Operation Date | August 1st, 2017 |
Location | Shichinohe town, Aomori |
---|---|
Capacity | 3,089kW |
Annual power generation | Approx.3,270,000kWh |
Commercial Operation Date | September 1st, 2017 |
Location | Hachinohe City, Aomori |
---|---|
Capacity | 1,008kW |
Annual power generation | Approx.1,170,000kWh |
Commercial Operation Date | August 6th, 2014 |
Location | Sakata City, Yamagata |
---|---|
Capacity | 28,531kW (after expansion) |
Annual power generation | Approx.30,000,000kWh |
Commercial Operation Date | December 1st, 2016 |
Location | Osaki City, Miyagi |
---|---|
Capacity | 1,771kW |
Annual power generation | Approx.1,860,000kWh |
Commercial Operation Date | February 28th, 2014 |
Location | Osato town, Miyagi |
---|---|
Capacity | 1,274kW |
Annual power generation | Approx.1,430,000kWh |
Commercial Operation Date | February 28th, 2014 |
Location | Nishigo village, Fukushima |
---|---|
Capacity | 44,000kW |
Annual power generation | Approx.47,300,000kWh |
Commercial Operation Date | January 2nd, 2020 |
Location | Tsuruoka, Yamagata |
---|---|
Capacity | 17,000kW |
Annual power generation | Approx.36,900,000kWh |
Commercial Operation Date | November 12th, 2021 |
Location | Shirakawa, Fukushima |
---|---|
Capacity | 73,892kW |
Annual power generation | Approx.79,700,000kWh |
Commercial Operation Date | November 20th, 2021 |
Location | Aomori city, Towada city, Shichinohe town, Aomori |
---|---|
Capacity | 33,600kW |
Annual power generation | Approx.113,000,000kWh |
Commercial Operation Date | December 28th, 2021 |
Location | Ichinohe town, Ninohe city, Kunohe village, Iwate |
---|---|
Capacity | 46,800kW |
Annual power generation | Approx.105,654,000kWh |
Commercial Operation Date | January 14th, 2023 |
Location | Tagajo city, Miyagi |
---|---|
Capacity | 1,030kW |
Annual power generation | Approx.1,193,771kWh |
Commercial Operation Date | February 25th, 2013 |
Location | Akita city, Akita |
---|---|
Capacity | 6,270kW |
Annual power generation | Approx.5,349,590kWh |
Commercial Operation Date | October 28th, 2014 |
Location | Oga city, Akita |
---|---|
Capacity | 2,400kW |
Annual power generation | Approx.2,654,170kWh |
Commercial Operation Date | March 24th, 2016 |
Location | Akita city, Akita |
---|---|
Capacity | 1,500kW |
Annual power generation | Approx.2,235,148kWh |
Commercial Operation Date | March 20th, 2003 |
Location | Sakata city, Yamagata |
---|---|
Capacity | 750kW |
Annual power generation | Approx.693,455kWh |
Commercial Operation Date | September 1st, 2020 |
Location | Iwaki city, Fukushima |
---|---|
Capacity | 26,680kW |
Annual power generation | Approx.27,659,310kWh |
Commercial Operation Date | April 1st, 2018 |
Location | Iwaki city, Fukushima |
---|---|
Capacity | 990kW |
Annual power generation | Approx.1,337,077kWh |
Commercial Operation Date | July 17th, 2014 |
Location | Towada city, Aomori |
---|---|
Capacity | 7,210kW |
Annual power generation | Approx.7,223,330kWh |
Commercial Operation Date | September 1st, 2019 |
Location | Fukushima City, Fukushima |
---|---|
Capacity | 32,400kW |
Annual power generation | Approx.64,300,000kWh |
Commercial Operation Date | May 1st, 2023 |
Location | Ishikari City, Hokkaido |
---|---|
Capacity | 3,013.5kW |
Annual power generation | Approx.3,778,000kWh |
Commercial Operation Date | May 31st, 2024 |
Location | Kami town, Miyagi |
---|---|
Capacity | 42,000kW |
Annual power generation | Approx.101,500,000kWh |
Commercial Operation Date | May 2nd, 2024 |
Location | Ishikari City, Hokkaido |
---|---|
Capacity | 3,013.5kW |
Annual power generation | Approx.3,778,000kWh |
Commercial Operation Date | July 19th, 2024 |
Location | Muroran City, Hokkaido |
---|---|
Capacity | 836kW |
Annual power generation | Approx.843,000kWh |
Commercial Operation Date | August 20th, 2024 |
This power plant generates power by wood biomass chips as fuel. Chips are recycled from wood construction waste in the Kanto region and are made from unused residue materials from forests, sawmill waste and woody materials from tree-clearing operations in the region, which are collected by Eco Green Holdings (a group affiliate of JRE). This plant is characterized by the extensive use of woodchips recycled from materials available in Japan and stable power generation comparable with ordinary thermal power plants.
Location | Kamisu city, Ibaraki |
---|---|
Capacity | 24,400kW |
Annual power generation | Approx.200,000,000kWh |
Commercial Operation Date | May 1st, 2019 |
Equivalent to the annual power consumption of
This solar power plant is located on unused semi-developed land in a large residential development of Mito New Town. With a total site area of around 50 hectares, it is one of the largest in east Japan. To improve its aesthetic landscaping by making it less visible from sidewalks, we have built embankments and planted dogwood and other trees around the plant.
Location | Mito City / Shirosato town, Ibaraki |
---|---|
Capacity | 44,444kW |
Annual power generation | Approx.43,600,000kWh |
Commercial Operation Date | January 5th, 2015 |
Equivalent to the annual power consumption of
Location | Mashiko town, Tochigi |
---|---|
Capacity | 8,064kW |
Annual power generation | Approx.8,600,000kWh |
Commercial Operation Date | March 25th, 2016 |
Location | Kamisu City, Ibaraki |
---|---|
Capacity | 2,640kW |
Annual power generation | Approx.3,120,000kWh |
Commercial Operation Date | July 1st, 2014 |
Location | Kamisu city, Ibaraki |
---|---|
Capacity | 3,162kW |
Annual power generation | Approx.3,600,000kWh |
Commercial Operation Date | September 1st, 2019 |
Location | Namegata City, Ibaraki |
---|---|
Capacity | 945kW |
Annual power generation | Approx.1,050,000kWh |
Commercial Operation Date | January 24th, 2014 |
Location | Miho village, Ibaraki |
---|---|
Capacity | 2,964kW |
Annual power generation | Approx.3,300,000kWh |
Commercial Operation Date | December 16th, 2015 |
Location | Miho village, Ibaraki |
---|---|
Capacity | 2,399kW |
Annual power generation | Approx.2,700,000kWh |
Commercial Operation Date | December 16th, 2015 |
Location | Miho village, Ibaraki |
---|---|
Capacity | 1,000kW |
Annual power generation | Approx.1,100,000kWh |
Commercial Operation Date | December 16th, 2015 |
Location | Miho village, Ibaraki |
---|---|
Capacity | 3,382kW |
Annual power generation | Approx.3,900,000kWh |
Commercial Operation Date | October 31st, 2018 |
Location | Inashiki city, Ibaraki |
---|---|
Capacity | 17,104kW |
Annual power generation | Approx.20,700,000kWh |
Commercial Operation Date | January 2nd, 2019 |
Location | Inashiki city, Ibaraki |
---|---|
Capacity | 6,052kW |
Annual power generation | Approx.7,000,000kWh |
Commercial Operation Date | April 1st, 2019 |
Location | Tsuchiura City, Ibaraki |
---|---|
Capacity | 23,078kW |
Annual power generation | Approx.26,500,000kWh |
Commercial Operation Date | September 1st, 2018 |
Location | Katori City, Chiba |
---|---|
Capacity | 2,068kW |
Annual power generation | Approx.2,460,000kWh |
Commercial Operation Date | May 1st, 2015 |
Location | Katori City, Chiba |
---|---|
Capacity | 2,461kW |
Annual power generation | Approx.2,900,000kWh |
Commercial Operation Date | May 1st, 2015 |
Location | Inashiki city, Ibaraki |
---|---|
Capacity | 665kW |
Annual power generation | 868,530kWh |
Commercial Operation Date | January 31st, 2022 |
Location | Kasumigaura city, Ibaraki |
---|---|
Capacity | 2,550kW |
Annual power generation | 2,761,414kWh |
Commercial Operation Date | November 15th, 2013 |
Location | Hitachi city, Ibaraki |
---|---|
Capacity | 2,040kW |
Annual power generation | 2,917,277kWh |
Commercial Operation Date | March 25th, 2016 |
Location | Asaka city, Saitama |
---|---|
Capacity | 1,030kW |
Annual power generation | 956,140kWh |
Commercial Operation Date | March 30th, 2016 |
Location | Fukaya city, Saitama |
---|---|
Capacity | 1,390kW |
Annual power generation | 1,731,828kWh |
Commercial Operation Date | March 20th, 2019 |
Location | Kawasaki city, Kanagawa |
---|---|
Capacity | 1,990kW |
Annual power generation | 1,737,786kWh |
Commercial Operation Date | March 25th, 2010 |
Location | Niigata City, Niigata |
---|---|
Capacity | 14,224kW |
Annual power generation | Approx.15,900,000kWh |
Commercial Operation Date | August 19th, 2016 |
Location | Niigata City, Niigata |
---|---|
Capacity | 907kW |
Annual power generation | Approx.978,000kWh |
Commercial Operation Date | March 1st, 2024 |
Location | Niigata City, Niigata |
---|---|
Capacity | 3,340kW |
Annual power generation | Approx.3,630,000kWh |
Commercial Operation Date | March 29th, 2024 |
This is the first wind farm JRE has constructed in the Hokuriku region. This wind farm is on a hill in Shika Town, Hakui District located at about the center of Noto Peninsula. From this site, you can enjoy a great ocean view with the long beautiful shoreline called Noto Kongo.
Location | Shika town, Ishikawa |
---|---|
Capacity | 9,600kW (The total output would be controlled to be 7,480kW or less) |
Annual power generation | Approx.17,200,000kWh |
Commercial Operation Date | January 18th, 2020 |
Equivalent to the annual power consumption of
Location | Omachi city, Nagano |
---|---|
Capacity | 2,443kW |
Annual power generation | Approx. 3,542,000kWh |
Commercial Operation Date | April 1st, 2022 |
Location | Toyama city, Toyama |
---|---|
Capacity | 2,860kW |
Annual power generation | Approx.3,084,264kWh |
Commercial Operation Date | January 1st, 2017 |
Location | Toyama city, Toyama |
---|---|
Capacity | 690kW |
Annual power generation | Approx.794,424kWh |
Commercial Operation Date | February 14th, 2022 |
Location | Takaoka city, Toyama |
---|---|
Capacity | 710kW |
Annual power generation | Approx.823,524kWh |
Commercial Operation Date | March 18th, 2021 |
Location | Sakai city, Fukui |
---|---|
Capacity | 2,860kW |
Annual power generation | Approx.3,281,232kWh |
Commercial Operation Date | January 1st, 2017 |
Location | Gamagori city, Aichi |
---|---|
Capacity | 650kW |
Annual power generation | Approx.730,366kWh |
Commercial Operation Date | March 28th, 2017 |
Location | Minamiise town, Mie |
---|---|
Capacity | 8,971kW |
Annual power generation | Approx.10,600,000kWh |
Commercial Operation Date | August 24th, 2017 |
Location | Hino town, Shiga |
---|---|
Capacity | 3,015kW |
Annual power generation | Approx.3,400,000kWh |
Commercial Operation Date | November 19th, 2018 |
Location | Takashima city, Shiga |
---|---|
Capacity | 13,180kW |
Annual power generation | Approx.14,200,000kWh |
Commercial Operation Date | May 1st, 2020 |
Location | Iwade City, Wakayama |
---|---|
Capacity | 2,485kW |
Annual power generation | Approx.2,900,000kWh |
Commercial Operation Date | March 10th, 2015 |
Location | Iwade City, Wakayama |
---|---|
Capacity | 1,285kW |
Annual power generation | Approx.1,500,000kWh |
Commercial Operation Date | March 10th, 2015 |
Location | Hidakagawa town, Wakayama |
---|---|
Capacity | 16,800kW |
Annual power generation | Approx.19,900,000kWh |
Commercial Operation Date | March 1st, 2016 |
Location | Arida city, Wakayama |
---|---|
Capacity | 8,500kW |
Annual power generation | Approx.11,497,000 kWh |
Commercial Operation Date | June 1st, 2023 |
Location | Himeji City, Hyogo |
---|---|
Capacity | 12,600kW |
Annual power generation | Approx.15,100,000kWh |
Commercial Operation Date | March 31st, 2016 |
Location | Kami City, Kochi |
---|---|
Capacity | 9,772kW |
Annual power generation | Approx.12,000,000kWh |
Commercial Operation Date | October 1st, 2017 |
Location | Ako gun, Hyogo |
---|---|
Capacity | 76,810 kW |
Annual power generation | |
Commercial Operation Date | January 6th, 2023 |
Location | Sanda city, Hyogo |
---|---|
Capacity | 121,088 kW |
Annual power generation | Approx.142,900,000 kWh |
Commercial Operation Date | August 16th, 2023 |
Location | Sakaiminato city, Tottori |
---|---|
Capacity | 841 kW |
Annual power generation | Approx.1,002,000 kWh |
Commercial Operation Date | March 27th, 2024 |
Location | Hamada city, Shimane |
---|---|
Capacity | 10,980 kW |
Annual power generation | Approx.12,313,980 kWh |
Commercial Operation Date | November 1st, 2015 |
Location | Hamada city, Shimane |
---|---|
Capacity | 11,870 kW |
Annual power generation | Approx.14,035,692 kWh |
Commercial Operation Date | March 1st, 2017 |
Location | Hiroshima city, Hiroshima |
---|---|
Capacity | 1,250 kW |
Annual power generation | Approx.1,537,446 kWh |
Commercial Operation Date | March 14th, 2016 |
Location | Ube city, Yamaguchi |
---|---|
Capacity | 492 kW |
Annual power generation | Approx.586,000 kWh |
Commercial Operation Date | February 28th, 2024 |
Location | Kudamatsu city, Yamaguchi |
---|---|
Capacity | 1,800 kW |
Annual power generation | Approx.2,313,779 kWh |
Commercial Operation Date | March 23rd, 2013 |
Location | Kudamatsu city, Yamaguchi |
---|---|
Capacity | 2,850 kW |
Annual power generation | Approx.3,101,826 kWh |
Commercial Operation Date | September 25th, 2014 |
Location | Shimonoseki city, Yamaguchi |
---|---|
Capacity | 1,090 kW |
Annual power generation | Approx.1,454,184 kWh |
Commercial Operation Date | November 11th, 2020 |
Location | Takamatsu city, Kagawa |
---|---|
Capacity | 1,390 kW |
Annual power generation | Approx.1,832,521 kWh |
Commercial Operation Date | February 18th, 2015 |
Location | Takamatsu city, Kagawa |
---|---|
Capacity | 1,490 kW |
Annual power generation | Approx.1,809,032 kWh |
Commercial Operation Date | March 22nd, 2022 |
Location | Masaki town, Iyo gun, Ehime |
---|---|
Capacity | 2,130 kW |
Annual power generation | Approx.2,746,447 kWh |
Commercial Operation Date | February 16th, 2015 |
JRE has been operating a hybrid power plant following its successful bidding in the city of Kitakyushu. Data collected there from the wind and solar power operation are to be analyzed to provide a useful reference for constructing more hybrid power plants in the future. The two large wind turbines erected on the coast are also designed for offshore operation with an aim to apply the experience gained to other offshore installations.
Location | Kitakyushu City, Fukuoka |
---|---|
Capacity | 3,042kW (Solar) 6,600kW (Wind) |
Annual power generation | Approx.3,500,000kWh (Solar) Approx.14,200,000kWh (Wind) |
Commercial Operation Date | September 1st, 2017 (Solar) January 1st, 2018 (Wind) |
Equivalent to the annual power consumption of
JRE’s first home-grown wind power plant in Kyushu stands on a mountain ridge at the highest altitudes in the region, between 1,000 and 1,200 meters. It is the first large wind power plant ever constructed in Miyazaki Prefecture. As a certified facility in Miyazaki’s Next Generation Energy Park, it hosts study tours, and in addition plays an instrumental role in environmental education in the region by, for example, taking part in local events.
Location | Gokase town / Morotsuka village, Miyazaki |
---|---|
Capacity | 16,000kW |
Annual power generation | Approx.4,100万kWh |
Commercial Operation Date | September 3rd, 2016 |
Equivalent to the annual power consumption of
Location | Gokase town / Morotsuka village, Miyazaki |
---|---|
Capacity | 12,800kW |
Annual power generation | Approx.28,700,000kWh |
Commercial Operation Date | September 4th, 2023 |
Location | Fukuoka city, Fukuoka |
---|---|
Capacity | 994kW |
Annual power generation | Approx.1,102,945kWh |
Commercial Operation Date | February 29th, 2024 |
Location | Fukuchi town, Fukuoka |
---|---|
Capacity | 2,334kW |
Annual power generation | Approx.2,700,000kWh |
Commercial Operation Date | April 17th, 2017 |
Location | Fukuchi town, Fukuoka |
---|---|
Capacity | 2,334kW |
Annual power generation | Approx.2,700,000kWh |
Commercial Operation Date | April 17th, 2017 |
Location | Fukuchi town, Fukuoka |
---|---|
Capacity | 2,334kW |
Annual power generation | Approx.2,700,000kWh |
Commercial Operation Date | April 17th, 2017 |
Location | Fukuchi town, Fukuoka |
---|---|
Capacity | 843kW |
Annual power generation | Approx.1,000,000kWh |
Commercial Operation Date | April 17th, 2017 |
Location | Aka village, Fukuoka |
---|---|
Capacity | 2,428kW |
Annual power generation | Approx.2,710,000kWh |
Commercial Operation Date | November 2nd, 2015 |
Location | Hirado city, Nagasaki |
---|---|
Capacity | 8,600kW |
Annual power generation | Approx.23,825,000kWh |
Commercial Operation Date | April 10th, 2024 |
Location | Kanoya City, Kagoshima |
---|---|
Capacity | 2,785kW |
Annual power generation | Approx.3,320,000kWh |
Commercial Operation Date | December 22nd, 2014 |
Location | Kanoya City, Kagoshima |
---|---|
Capacity | 2,503kW |
Annual power generation | Approx.2,980,000kWh |
Commercial Operation Date | November 5th, 2014 |
Location | Kanoya City, Kagoshima |
---|---|
Capacity | 1,403kW |
Annual power generation | Approx.1,530,000kWh |
Commercial Operation Date | March 14th, 2014 |
Location | Kanoya City, Kagoshima |
---|---|
Capacity | 1,145kW |
Annual power generation | Approx.1,200,000kWh |
Commercial Operation Date | March 5th, 2014 |
Location | Makurazaki City, Kagoshima |
---|---|
Capacity | 2,946kW |
Annual power generation | Approx.3,800,000kWh |
Commercial Operation Date | February 1st, 2018 |
Location | Takamori town, Kumamoto |
---|---|
Capacity | 62,525kW |
Annual power generation | Approx.71,500,000kWh |
Commercial Operation Date | May 19th, 2022 |
Location | Yamato-cho, Kumamoto |
---|---|
Capacity | 79,955kW |
Annual power generation | Approx.99,400,000kWh |
Commercial Operation Date | September 7th, 2022 |
Location | Satsuma town, Kagoshima |
---|---|
Capacity | 54,227kW |
Annual power generation | Approx.64,800,000kWh |
Commercial Operation Date | January 11th, 2023 |
Location | Yatsushiro city, Kumamoto |
---|---|
Capacity | 900kW |
Annual power generation | Approx.1,164,124kWh |
Commercial Operation Date | December 5th, 2021 |
Location | Yatsushiro city, Kumamoto |
---|---|
Capacity | 916kW |
Annual power generation | Approx.1,187,730kWh |
Commercial Operation Date | March 22nd, 2024 |
Location | Oita city, Oita |
---|---|
Capacity | 910kW |
Annual power generation | Approx.1,059,465kWh |
Commercial Operation Date | March 24th, 2015 |
Location | Uruma city, Okinawa |
---|---|
Capacity | 12,200kW |
Annual power generation | Approx.15,039,106kWh |
Commercial Operation Date | March 23th, 2015 |
Location | Pingtung County, Taiwan |
---|---|
Operating company | Xin Wang Co., Ltd. |
Capacity | 1,750kW |
Annual power generation | Approx.2,150,000kWh |
Commercial Operation Date | September 1st, 2020 |